 |
Topics covered in this course include:
- Key concepts and capabilities of HP Output Server
- Basic architecture
- Using the HP Output Explorer tools
- Pausing, maintaining and resuming output devices and job queues
- Tracking jobs to completion
- Resubmitting, canceling and modifying jobs
- Monitoring queues and job status
- Assisting with typical output problems
- Verifying permissions
- Entering destination and phonebook information
- Using the HP Output Envoy tools
On-site Requirements
On-site training classes and courseware are most effective in specific classroom, computing, and network environments. Therefore, it is required that the following provisions be met. Please contact Kristi Guyer (kristi.guyer@hp.com) for specific setup and/or hardware requirements or if you have questions or concerns about meeting any of the below requirements.
1. A classroom large enough for all students to sit comfortably.
2. A whiteboard with markers and an eraser. A flip chart with markers is not sufficient. Nor is a whiteboard the size of a flip chart.
3. A way to display slides generated from a laptop computer.
4. One Windows host for each participant. Machines must have TCP/IP installed with a static IP address for the duration of the class. The Administrator password must be available to the instructor on the day of setup.
NOTE: Refer to the HP Output Server Install & Configure Manual, HP Output Server 3.5 Release Notes, and the most recent Patch Release Notes for more specific operating system information. Those documents can be downloaded from the customer support web site (http://www.hp.com/united-states/outputmanagement/support.html).
|
 |